SHUFFLE 180 HDK User Guide

FLANGE PLATE MOUNTING

D

1

2a

Foresee the number and dimension for flexible empty pipe.

2b

80-100mm 3.2-3.9in

400mm 15.8in

Using the supplied jig, place the anchor bolts inside the concrete moulding leaving threaded extremity out. The extremity depends on the type of installation and how the finishing is done.

It should have enough space for M18 nuts, washers and tool for tightening. The anchor bolts are delivered along with the pole (flange plate version).

4

3

Fill the moulding with concrete C16/20 (B20).

After concrete curing, remove jig.

5/14

www.schreder.com

00-63-030 | DOC-0016143 Rev C | 11-2019

Powered by