Installation Instructions for the OWLET IV NEMA
OWLET IV
NEMA Luminaire Controllers
Installation Instructions
DATALIFT N MESHNODE N
QR code to access the online
installation instruction.
IP 66
IK 08
INSTALLATION VIDEO
www.schreder.com
/4
DOC-0020638 OWLET IV NEMA-INS-D | 03-2025
OWLET IV
NEMA Luminaire Controllers
Installation Instructions
DATALIFT N MESHNODE N
QR code to access the online
IP 66
IK 08
installation instruction.
PRODUCT
DATALIFT N
MESHNODE N
Ta: -40°C to +65°C -40°F to +149°F Mains voltage: 110-240V Frequency: 50/60Hz Max load current: 5A
Ta: -40°C to +65°C -40°F to +149°F Mains voltage: 110-240V Frequency: 50/60Hz Max load current: 5A
72.9mm 2.87in
90.7mm 3.57in
Ø 92.2mm 3.63in
Ø 92.2mm 3.63in
XX/XX FW: X.X.X.X SN: XXXXXXXXXXXXXXXX
XX/XX FW: X.X.X.X SN: XXXXXXXXXXXXXXXX
0.18kg 0.40lb
0.23kg 0.51lb
kg lb
kg lb
Red bottom
Grey bottom
BEST LOCATION, RATIO & DISTANCE
1 DATALIFT : 10 MESH
DATALIFT
MAX. 500M
MAX. 100M
MESHNODES
www.schreder.com /4
1
DOC-0020638 OWLET IV NEMA-INS-D | 03-2025
INSTALLATION
Before installation contact Schréder FAE (Field Application Engineer) for support.
During installation, ensure correct body position over the luminaire.
2
1
Q
A
FAE
Turning indications on top of controller.
Controller
3
Hold controller.
NEMA Socket
Align the longer pin (Neutral) first.
4
Align the controller power pins with slots in the socket.
Check if the surfaces between the controller and NEMA socket are parallel and plug in.
Push the controller firmly down. Make sure it is vertically aligned.
5
6
± 55 N (12.5 lbf)
1
2
Correct position: vertical
Incorrect position: twisted
//
//
www.schreder.com /4 2
DOC-0020638 OWLET IV NEMA-INS-D | 03-2025
INSTALLATION
7
Turn controller ± 45° clockwise until it locks.
4.5 N.m (3.3 lbf.ft)
The installer is responsible for verifying the installation.
VERIFICATION
8
Visual Verification
Symbol on controller and gasket are aligned. NEMA socket with internal RFID
Incorrect installation: Surfaces of controller and NEMA socket are twisted.
Correct installation: Surfaces of controller and NEMA socket are parallel.
Mechanical Verification
NEMA socket with external RFID Symbol on controller and socket label are aligned.
9
Pull the controller up to check if it is locked
10
Extra barcode labels are supplied with the controller
Example list and map.
Inside pole door
www.schreder.com /4
3
DOC-0020638 OWLET IV NEMA-INS-D | 03-2025
SELF-TEST PREPARATION 11 1
SELF-TEST PHASE 1
Note : The self-test occurs only in the first 5 power cycles after installing the controller. * 1-10V can take longer than 10 seconds between cycles.
2
The controller reduces light to 0%.
The controller increases light to 100%.
The controller reduces light to driver minimum value.
The controller switches OFF the light completely.
When powering on the luminaire, the light switches ON to maximum level.
0%
0%
100%
Driver minimum
100%
10 seconds
10 seconds
10 seconds
10 seconds
PHASE 2 DAY-TIME SELF-TEST
FAIL - Luminaire is OFF . Light does not turn on. RED light in the controller is ON .
3
4
OPTIONAL MOTION DECTECTION TEST Trigger a motion detection in the luminaire during day-time test.
PASS - Luminaire is ON . Light decreases from 100% to 20%.
FAIL - Light level does not change.
PASS - Light level increases to 100% then decreases to initial level.
100% 20%
0%
20% 100% 20%
20%
20%
120 minutes
NIGHT-TIME SELF-TEST
5
6
OPTIONAL MOTION DECTECTION TEST Trigger a motion detection in the luminaire during night- time test.
PASS - Luminaire is ON . Light decreases from 100% to 20% then increases to 100%.
FAIL - Luminaire is ON. Light is at 100%. RED light in the controller is ON .
PASS - Light level decreases from 100% to 70% then increases to initial level.
FAIL - Light level does not change.
100%
100% 20%
100%
100% 100%
100%
70%
100%
120 minutes
7
After the self-test, the luminaire operates as configured on the Schréder EXEDRA platform.