INSTALLATION
Before installation contact Schréder FAE (Field Application Engineer) for support.
3
During installation, ensure correct body position over the luminaire.
1
Q
A
FAE
2
Remove cover from socket.
Turning indications on top of controller.
Align the controller’s larger locking pin with the larger locking slot of the ZHAGA socket, and fit the controller gently into the socket.
4
5
Controller
2
1
ZHAGA Socket
7 The installer is responsible for verifying the installation. MECHANICAL VERIFICATION
6
Pull the controller to check if it is locked
Turn controller clockwise until it locks.
8 Extra barcode labels are supplied with the controller